The load on every motor point, before it goes up.
Hang the LED wall, the lighting and the cable on the truss and see what each motor carries — worked out along the truss, not the total divided by the number of motors.
Create a free accountFree for touring crews. An estimate for planning, not a structural sign-off.
- Drag a motor and every point load updates live
- Flags any point near or over its motor’s rating
- The roof load at every point, ready for the venue
Why not divide the total by the number of motors?
Dividing the weight by the number of motors assumes each one carries the same share, and on a real truss they rarely do. An overhang past the end motor, a heavy section of LED wall between two points, or uneven spacing all move load from one point onto another. TrussLoad works it out along the truss instead, point by point, from where each load actually hangs.
What you put in
The length of the truss, where each motor hangs, and what hangs on it: spread loads such as a screen or a run of fixtures, point loads, and the cable. The truss’s own weight, each motor and its chain, and the rigging hardware are added for you from starting figures, and any of them can be replaced with the real number from the spec sheet.
The load each motor should carry
TrussLoad gives the expected load at every point: the truss treated as one continuous beam over all the motors, with every one at the same trim. That is how the load really shares out on a straight run, and it is not an even split — over two equal spans the middle motor takes 62.5% of the load, not a third or a half. The figures on the drawing add up to what is on the truss.
It is the share with everything level. A motor trimmed a little low sheds load onto its neighbours, so keep the truss level and leave headroom on every point.
What it is, and what it is not
TrussLoad is a planning estimate from the figures you enter, for the advance and the conversation with the venue. It is not a structural calculation or an engineer’s sign-off: the truss manufacturer’s and the venue’s limits still apply, and a competent rigger still checks the plan before anything leaves the floor.